Adega mangualde entrada

Thank you for your support of this project.

State Planning
Location Mangualde
Network Power 150.0 kW
Total Investment 105 000 €
Host Adega Cooperativa de Mangualde
Technology
Power 173.8 kW
Annual Output 250 480 kWh
CO2 Savings 160.3 Ton CO2/Year
Number of Houses Powered 96
Connection Date ---
Number of Panels 632
Panel Type Suntech 275 Wp
Panel Warranty 12 Years
Inverter Type SMA
Inverter Warranty 10 Years